+34 965 854 423

Haz una llamada

 is my house on urban land?

is my house on urban land?

In many real estate operations, buyers and sellers are often faced with the question ” Is my house on urban land? ” and the answer could influence remarkably the completion of the operation.

What is urban land?

Spanish law clearly defines urban land to that which has completed urban infrastructure. For urban infrastructure, the law understands paved access roads, pavements (sidewalks), street lighting, water and electricity supply, and a main drainage system. In particular, roads, pavements, and installations must comply with special regulations related to minimum sizes and technical characteristics.

Why do so many urban settlements have incomplete urban infrastructure?

Unfortunately, the majority of urban settlements and urbanizations are older than the national laws which regulate the urban land and the municipal urban planning regulations. Therefore to explain and in a way give a certain legal status to this situation, councils define these settlements as part of the urban land, but without urban infrastructure or not completed urban infrastructure. The local plan defines for each urban area the missing infrastructure needed to be completed. Private owners are considered as part of the urban planning of the municipality and are requested to assume charges and works of the missing infrastructure.

What are the consequences to be taken on by private owners?

In settlements where the urban infrastructure is incomplete, private owners can be confronted with two possible scenarios.

  1. In the first scenario a developer owns the majority of the land and decides to complete the infrastructure as part of a real estate promotion. The rest of owners will be affected by this promotion and will be required to assume the correspondent costs in relation to their percentage of participation in the settlement, according to the surface of the land they own. In some cases owners have to cede part of their own land, in order to enlarge roads or build the missing pavements.
  2. In the second scenario, the owner decides to do an intervention in his property which will affect the original volume, size, surface, drain installation or structure; usually known as “major works”. In order to grant the building license, the council will require the owner to assume the cost of the missing urban infrastructure to be completed in front of his property. Urban infrastructure major works are usually not to be expected to be assumed by councils.

What is the concept “fuera de ordenación”?

A literal translation of the concept is “out of order”. Regarding urban planning, the concept defines the status of constructions built according to older rules, prior to the existence of any urban development regulation or in the case of buildings in completed urban settlements not complying with the current regulations. In these cases, the use of these buildings is allowed if it complies with the general use of the area. An old industrial building will not be allowed in a current residential area, but an old residential building is allowed to continue being used in this function, even if it does not comply with the current regulations. Maintenance works, as long as the functionality of the building is preserved, are allowed but never major works.

What is the usual confusion with the Catastro?

The Catastro is the department of the tax authority in charge of setting real estate taxes. For that reason, this administration has recorded the complete national territory. For the Catastro, all kinds of built constructions are considered urban, even if they are located in non-urban land. But the Catastro condition of urban is not the same as the legal condition for a piece of land to be defined as urban.

We firmly advise all real estate operations to have legal support from a solicitor and technical support by an architect acting as a surveyor. Operations, where there are doubts, should not be completed without a structural survey including the urban status of the building, a certificate describing the building, habitability conditions including its age, and an urban report issued by the council. In the cases of buildings “out of order”, a certificate issued by the town hall granting that it has no open file of urban infraction.

For More Information, do not hesitate to contact us.

Javier Leonardo Rímolo Arquitecto
Rimolo & Grosso

0034 606616084
0034 962962324

https://www.arquitectosperitostasadores.com/
es_ESSpanish